Upon further consideration and based on input from our community I
recommend we move forward in Stages.
First Stage: Service the server area (dedicated 20A breaker), 3d print area
and Museum with another 20A breaker. Thus satisfying the Fire inspection
needs.
Stage 2, phase 1: Install plugs along Eastern wall (3rd 20A breaker)
Stage 2, phase 2: Install 240V service to Robot on Eastern wall. Other 240v
needs?
Stage 2, phase 3: Install overhead power (either using the 4th available
position of the Balcony breaker or tying into the 3d printer/museum j-box)
I need to know about the Robot power requirements. I looked through the
manuals posted by Jake and have not found the amperage rating for the
control box+robot. Im working under the assumption that she requires a 30A
dedicated 240V supply and Jake will preform 3phase magicianary.
The reason I ask is because I need to size the breaker accordingly, and we
have limited real estate within the Balcony panel (located in the music
room). Currently (no pun intended) there are 4 breaker positions available
in the Balcony panel. I think that all 240V supply, be it 30A(robot?) or
50A(welder?) any exhaust fans, dust collection service or whatever will
have to be supplied from, not the Balcony panel, but the sub that feeds the
Balcony called "Above Stage" panel.
I recommend having dedicated breakers for the 240V supplies. Unless we know
exactly what will be powered, there is no way of passing the <50% amperage
usage per plug requirement of the NEC. This is simply the best practice.
Furthermore, this should not be an issue if we are using the "Above Stage"
panel because according to notes on the panel, most breakers within are not
being utilized- so there is plenty of space.
I'll continue to draft the drawings based on what I have written here.
Hopefully the package will be complete and ready for review by this Friday.
https://docs.google.com/spreadsheets/d/1Fgw5himtlmemiXReP-fG6rP-I2RoXsSP_MA…
Thanks,
Whit
On Wed, Aug 20, 2014 at 6:05 PM, Whitney Lawrence <whitneyel3(a)gmail.com> wrote:
> I'm not making it to the meeting this evening. I have a draft together minus
> the quantity sheets, however, current q estimates are included in the shared
> spreadsheet under the Qty. tab. You will notice that the estimate is $1k.
> Please take a look at the pdf's and mark them up however you like and send
> me red-lines I will then make v1.1 of the package with hopes of getting the
> q sheet(s) done by Friday.
Whitney, sorry I just saw this now, so I don't think it got on our
meeting agenda.
You think we should be allocating $1k to electrification rather than
the $500 we agreed on last week - do I understand that right?
> Additionally, I request that my August and
> September dues be in the form of electrical design and installation.
We definitely encourage people to consider their labor as dues if they
are otherwise unable to pay. :)
> Lastly,
> because I am not a licensed electrician, these drafts need to be reviewed by
> a professional prior to construction. It would suck if we had to re-run or
> otherwise modify our work once the inspector comes. So if anyone has an
> electrician friend that can weigh in that would be helpful. Also has anyone
> put any effort into weather or not we need a permit prior to beginning this
> improvement?
Once the draft is ready, I think we have two electricians in our circle so far:
* the person Jake suggested, not C10
* Dave Pedroli (gone til september)
Maybe we can ask one of them how permitting works?
are here: https://sudoroom.org/wiki/Meeting_Notes_2014-08-20
Highlights:
* Two new prospective members: Sean & Adam!
* Omni potluck tonight, 6-8 in the ballroom. Please bring food!
* BACH unconference Oct 18-19
* new vending machine
* Julio is (tentatively) hosting Newbie Night on Tuesday
Most of the time was taken discussing general Omni issues. In sum, the
Omni is going through an exciting formative moment and needs as many
volunteers as possible, especially to:
* fix fire code violations - research fire extinguishers, put up drywall
* assist David Keenan in delegating other permit tasks
* attend working groups such as finance, legal, maintenance &
challenging dominant cultures
* come up with plans for: parking, litter, insurance issues
* replace our board secretary
* replace me as Sudoroom's delegate to the Omni :)
In addition, Sudo urgently needs volunteers to:
* set up new ways to donate money
* fix the internet!!!!!
Hey Sudoers,
I know that some Sudo folks have been temporarily storing some things in
the room off of the stage.
It seems that the door has been locked, however, and there are light
switches that control some outdoor lighting that we need to get to.
Anyone know who locked this room / who may have a key? We should keep that
door unlocked, moving forward (or give all collectives keys) in the event
that prospective new Omni members / tenants may want to consider using that
space.
xo
Niki
I'm not making it to the meeting this evening. I have a draft together
minus the quantity sheets, however, current q estimates are included
in the shared
spreadsheet
<https://docs.google.com/spreadsheets/d/1Fgw5himtlmemiXReP-fG6rP-I2RoXsSP_MA…>
under
the Qty. tab. You will notice that the estimate is $1k. Please take a look
at the pdf's and mark them up however you like and send me red-lines I will
then make v1.1 of the package with hopes of getting the q sheet(s) done by
Friday. Additionally, I request that my August and September dues be in the
form of electrical design and installation. Lastly, because I am not a
licensed electrician, these drafts need to be reviewed by a professional
prior to construction. It would suck if we had to re-run or otherwise
modify our work once the inspector comes. So if anyone has an electrician
friend that can weigh in that would be helpful. Also has anyone put any
effort into weather or not we need a permit prior to beginning this
improvement?
Thanks,
Whit
Join LocalWiki and Code for San Francisco for a day of sharing knowledge on
government services! From bike lanes to healthcare, you may be surprised
what resources our local government helps to provide. You may even surprise
all of us with what you know!
We'll be adding our knowledge to the San Francisco LocalWiki (
http://localwiki.net/sf), a collaborative community website where people
share all kinds of information about the city of San Francisco. Bring a
laptop if you have one, but we'll also have plenty to work on together.
*This is a free event! Childcare and lunch (vegan & gluten-free available)
will be provided.* We'll have expert LocalWikians on hand to help
participants.
*RSVP: *http://cityknowledgeshare.splashthat.com/
*DATE:* Saturday, August 23rd
*TIME: *10:00am - 5:00pm
*LOCATION:* Code for America, 155 9th St, San Francisco (directions
<http://www.mapquest.com/#c2ce4aa88dd0e40e667931a5>)
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA512
Hey all -
Seems like there's a lot happening this upcoming Thursday at Omni but
if anyone has interest in concepts relating to decentralized
autonomous organizations
(https://en.wikipedia.org/wiki/Decentralized_Autonomous_Organization),
I'd suggest stopping by the Ethereum meetup at 20Mission in SF titled
"Decentralized Governance; Censorship-ResistanÂt Decision-Making"
http://www.meetup.com/EthereumSiliconValley/events/195409302/
Cheers!
- -Paige
-----BEGIN PGP SIGNATURE-----
Version: GnuPG/MacGPG2 v2.0.19 (Darwin)
Comment: GPGTools - http://gpgtools.org
Comment: Using GnuPG with Thunderbird - http://www.enigmail.net/
iQEcBAEBCgAGBQJT88RYAAoJEBfwQOvcZQ/pPCAH/i+khUQqPHGMNuEJSHS4rY7e
qg+eIUoeAVHlx2VDq4Xj2PurQj6TxVFwJfzGTTfoNuVh5gg2xI2f/gtCGbCoLHJC
5p9uRSItRmBuAWtIISB6KlsV/gY1gJQwFUnnnBj6kFK5Bpjc9xnXcWaXX2I97vjq
MIGUt49osm0W+g7n1C62eByNHNs4DK0HcmgTXF/g4/qgfvj4rMv9SVc/v8ORqhYh
WVitDaQiw0eCs1/Z5AtYD8TyKzB2aDa73qdcVMt75MjJCh8v+UAnbsz5Vm05W/Z/
kaiQpLmpmnJLj7N8mw8AYdf/SnTaJmTN6kdzDBm0LDvAXv4NvMbRtPK2hVf7FNo=
=A2Tb
-----END PGP SIGNATURE-----
I too am in for $20 and I look forward to seeing it stocked with awesome
stuff! in particular, i look forward to being able to get an awesome
logic analyzer from it. I will contact metrix create space and ask for
info on the coolest stuff they load their machine with.
-jake
Marc Juul wrote:
Let's get sudo room a vending machine and put all kinds of awesome stuff
in it!
Here are some things we could sell:
Arduinos!
Actual healthy snacks!
3D printed magnets!
Mate straws!
USB sticks with bootable linux and lots of creative commons media!
Basic hygiene supplies (yay fewer stinky sudoers!)
Tiny mesh routers:
http://www.ebay.com/itm/US-TP-LINK-TL-WR703N-Mini-Portable-802-11-b-g-n-150…
Dogecoins!
Stickerpacks!
Logic analyzers:
http://www.dx.com/p/logic-analyzer-w-dupont-lines-and-usb-cable-for-scm-bla…
Basically everything from the hackpack ( http://hackpack.me ) and more
It could become a money-maker for sudo room.
If we get it, I will hook it up to the membership system so you can use
your sudo room membership card to buy items!
They are about $200.
I will put down $20 toward this purchase. Who is with me?
Here's one for sale right now:
https://sfbay.craigslist.org/eby/bfs/4620045642.html
--
marc/juul